Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 147 of 1370

Field for CCTV scoring standard used

Need a field to display the standard used to score the approved survey. It should say 'NASSCO PACP v6' or 'MSCC' and all the other defect standards. Right now there is no field so you can't tell whether a pipe inspection was scored using PACP v6 o...
Tim Medearis over 4 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

Add filters to inspection charts

The charts tool, when viewing PACP inspections, currently shows the distribution of scores only. For reporting purposes, it would be nice if some additional parameters could be added. For example, seeing the score distribution across pipe or inspe...
Kim Solberg over 1 year ago in Info360 Asset / Map visualization 1 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Integration and visualization of Electroscan data

Electroscan data is a condition assessment technology that uses current readings to detect potential infiltration and inflow defects along the length of the pipe. The current vs length readings can be displayed in a plot diagram in InfoAsset Plann...
Martha Nunez over 1 year ago in Info360 Asset / CCTV Standards (e.g. PACP) 0 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest about 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi almost 2 years ago in InfoWorks WS Pro / Other 0 For Review

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support