Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 5 of 1370

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Infoworks ICM- Sewage Temperature Modelling and Heat Losses

The following features should be added to Infoworks ICM for modelling temperature impacts for Heat extraction or heat insertion projects: - Sewage temperature to be added in WWG file as a pollutograph parameter and can also be defined in a diurnal...
Guest about 5 years ago in InfoWorks ICM / Temperature / Wastewater 0 Gathering support

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap

Detention Time Modelling

We would like the model to calculate detention time of sewer in a simulation. The idea is similar to water age calculation in WS. The aim is to use this as a proxy for odour study, in essence we would like to be able to create thematic maps to sho...
Guest about 5 years ago in InfoWorks ICM / Reporting / Results / Wastewater 0 Gathering support