Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 5 of 1370

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Flooding extents boundary

Would like the ability to export the maximum 2D flooded boundary so I can show this in Civil 3D.
Guest 10 months ago in InfoDrainage / 2D Flooding 2 Already exists

Point and line source objects for flooding 2D Analysis

I would like to assess the site and drainage network for flooding from a particular source that does not originate from a surcharged network. ICM has both of these objects available. The idea would be to connect a base flow, hydrograph or catchmen...
matthew.piggott 8 months ago in InfoDrainage / 2D Flooding 0 For Review

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap