Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez over 2 years ago in Info360 Asset / Query types / Capabilities 1 Gathering support

Provide Preconfigured Rehab Decision Tree Logic for Customers to Get Started

No description provided
Mike Maylone almost 3 years ago in Info360 Asset / Decision Tree Canvas 3 On roadmap

Rehab Action Filter Options for Results need expanded

When querying a Rehab Action in the Results table, we only have the Operator option of 'is any of'. Looking to have the opposite available, something like 'is not equal too'. We are having to select many values to set the filter = where if we have...
Todd Plank 9 months ago in Info360 Asset / Query types / Capabilities 2 Under consideration

Baseline Replacement Cost Tool

IAP has a very simple baseline replacement cost tool. It has been requested to be in Info360 Asset. Could be rolled into the deterioration modeling tool. https://help.innovyze.com/space/infoassetplanner/15794424/Baseline+Replacement+Cost
Tim Medearis about 2 years ago in Info360 Asset / Rehabilitation Planning 1 Gathering support

Display linked live data in long section view

When calibrating a model with multiple pressure loggers, it would be useful to see reference HGL's in the Long Section view at any points with live data. This could be represented as floating points based on the current timestep. This helps unders...
Nathan Gerdts over 2 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Manhole Rehab

Many utilities analyse manholes as part of their CIP programs.
Martha Nunez over 1 year ago in Info360 Asset / Decision Tree Canvas 1 In progress

Enhancement of the CSV option for Live data configuration

currently it is possible to use a csv in the live data file for a single set of data, however most it would be useful if you could have a csv with date time down the side and multiple flows or pressures across the way (Header row of Date Time, Pre...
Duncan Allen over 1 year ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Smart meters

Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution ...
Guest almost 6 years ago in InfoWorks WS Pro / Data Exchange / Telemetry 2 Under consideration

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support