InfoAsset Manager - Add more reports to Ruby Exchange method

Currently Ruby supports the following generation of reports:The Reports which are supported and generated via this method are: Manhole Report - ['cams_manhole',nil] Manhole Survey Report - ['cams_manhole_survey',nil] CCTV Survey Report - ['cams_cc...
Anthony Andrews 23 days ago in Info360 Asset / Reporting 0 For Review

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts about 2 months ago in InfoWorks WS Pro / Operations 0 For Review

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini 10 months ago in InfoWorks WS Pro / Operations 1 Gathering support

All asset types should be available in Rehab Model

Many utilities analyze other assets such as manholes, laterals, force mains, valves, hydrants, and vertical assets.
Martha Nunez over 1 year ago in Info360 Asset / Rehab 0 On roadmap

Add Workspaces to Info360 Asset

Currently in Info360 Insight, you can use workspaces to add and save all your key content to a dashboard view. This same capability would be huge for Asset users. For example, you could create a view that shows: All of your highest risk assets in ...
Mike Maylone over 2 years ago in Info360 Asset / Other 0 Gathering support

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 7 months ago in InfoWorks WS Pro / Operations 0 For Review

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Operations 0 Gathering support

Add the 'count of assets' under the Linear risk method (same as 5x5 matrix)

The 5x5 matrix provides a great summary on where pipes fall under the different 'buckets' this would be extremely useful for linear risk method as well as it helps the user determine their ranges dynamically.
Martha Nunez over 1 year ago in Info360 Asset / Risk 1 Under consideration

Generate Risk/Rehab results for segments not assets - Stormwater

In stormwater systems assets change structural characteristics along the length of the asset. This means, materials change and this needs to be represented in the risk analysis. In addition, work tasks are generated for segments instead of the ful...
Martha Nunez about 2 years ago in Info360 Asset / Risk 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support