Skip to Main Content
Autodesk
Status For Review
Product InfoDrainage
Categories Hydraulics
Created by Josh Beattie
Created on Nov 24, 2026

Allow successive storms to be run

Some LLFAs require a subsequent storm to be attenuated should a feature not reach a half drain down time of 1440 minutes. To run these successive storms currently, you have to create your own hyetograph from the hyetographs of each individual storm and then import it as an .idredx file (or create manually, incredibly laborious if its a long duration storm).

An option in the analysis manager to run successive storms, such as 1:100 year 1440 min followed by 1:10 year 1440 minute storm would make this process easier and allow for easier sensitivity testing.

Would also be really useful to add a 'delay between storms' option to add a dry period between the rainfall events where the network continues to be simulated before the next chosen rainfall commences.

  • Attach files