Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 71

Provide EPASWMM5 Simulations in InfoWorks

Allow me the ability to run SWMM5 in InfoWorks ICM
Guest about 6 years ago in InfoWorks ICM 1 Launched

"Limiting discharge" field/functionality for subcatchments

For large storm events, not all subcatchment runoff will be able to enter the piped system - inflows will be limited by the size (and condition) of roof downpipes, road gullies, etc. Therefore, I would like for ICM to be able to 'cleanly' deal wit...
Jason Kulsdom over 3 years ago in InfoWorks ICM 1 Launched

Export a Scenario

For XPSWMM, I would like to have a feature for the scenario manager to export a scenario as a standalone model. Some times, the end user doesn't want to see all the scenarios. It will be similar to ICM, you can export a scenario as a standalone n...
Guest over 3 years ago in InfoWorks ICM 0 Launched

Easily break into a conduit with a new node

To be able to insert a node (manhole) onto an existing conduit, and have the conduit split at the new node. the node chamber floor would be at the invert of the conduit at that point and that same invert would be assigned to the replacement condui...
Gregory Smith almost 4 years ago in InfoWorks ICM 1 Launched

As a Company would like to store models in a Workgroup Db

provide workgroup functionality to allow multiple models to be stored within a workgroup database for colaboration across the business
Richard Robinson about 4 years ago in InfoWorks ICM 0 Launched

Pipes and Pits

How to link import gis pipe layer with inverts
Guest about 4 years ago in InfoWorks ICM 0 Launched

Being able to send ICM Live alerts to a specific Table/DB

Can the system export all the alert lists generated by all models (from one deployment manifest) into a single table or database that can then be exploited by a visualisation software (i.e PowerBI).
Jose Pereira over 4 years ago in InfoWorks ICM 1 Launched

Ability to import XPRafts models into InfoWorks ICM

No description provided
Guest over 5 years ago in InfoWorks ICM 0 Launched

Reduce validation time of models with river banks or inline banks

Current validation of models with bank lines takes a long long time for larger models, Up to several hours. My first guess is that checking a vertice bank level against the mesh level is the probelm. Same thing happens when you want to update grou...
Jan Meulen almost 6 years ago in InfoWorks ICM 0 Launched

NowCast data from Australian BOM

Ability to work with some of the new data from the Australian BOM.
Guest about 6 years ago in InfoWorks ICM 0 Launched