Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 144

Multiple Pipe Networks in One Phase

When exporting from Civil3D to InfoDrainage, if I have multiple pipe networks they all export in separate phases. It would be very helpful to be able to export multiple pipe networks into a single phase of InfoDrainage. This would improve useabili...
Guest 5 months ago in InfoDrainage / Civil3D Integration 2 Gathering support

Add ability to alter storm water control colours fo differing control types

Add ability to alter storm water control colours fo differing control types. i.e. Attenuation Tanks = Blue, Bioretention = Green, Permeable Paving = Yellow etc. At present all controls are orange by default. It would aid visualisation.
David Williams 5 months ago in InfoDrainage / Visualization 0 Gathering support

Integration with Industry Cost Data (E.g. RSMeans) for Rehab Costs & Updates

Integrate with industry cost data source like RSMeans. User can link their rehab actions to labor, equipment, material costs which will automatically be keep updated by region.
Mike Maylone over 1 year ago in Info360 Asset 0 Gathering support

Expanded use of the 'lining material' field

Pipes that are lined have to be updated in the GIS. Info360 Asset provides 'lining material' and 'lining type' fields. I think it would be beneficial to utilize this field in the risk analysis when assessing the 'pipe material' component to look a...
Martha Nunez almost 2 years ago in Info360 Asset / Asset Deterioration Modeling 0 Gathering support

Ability to filter assets upon import.

It needs an easy way to filter assets from the GIS that are not needed for cctv/risk/rehab evaluation. For example, exclude abandoned assets, decomissioned, replaced, etc.
Martha Nunez almost 2 years ago in Info360 Asset 1 Gathering support

Flow Path (Profile Plots)

Would love a plot setting to show which design storm is being run as it relates to the max. water level
Jess Ewing about 2 years ago in InfoDrainage / Reporting 2 Gathering support

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc
Guest over 2 years ago in InfoDrainage / Reporting 3 Gathering support

Insert contours at regular intervals instead of "double pegs"

Currently, contours can be added at irregular intervals by using the "double pegs" function in InfoDrainage. In reality, contours are always placed at regular intervals, such as a major contour at every 10 ft or 5 ft of elevation. The option to ad...
Daniel'le DeVoss about 2 years ago in InfoDrainage / Visualization 1 Gathering support

Lock pipe diameters only.

After simulation and there is flooding, trying to upsize the pipes, if the wizard is run again it reverts to the previous diameter, i dont want to lock (ALL) as i still want to use the wizard to lower the inverts etc, downstream.
Steven Gilchrist about 2 years ago in InfoDrainage / Hydraulics 3 Gathering support

Adding interception and evaporation losses to Permeable Pavements, Bioretention systems etc.

There is currently no option to consider depression storage, interception and evaporation losses while modelling SuDS components such as Permeable Pavements, Bioretention systems etc in InfoDrainage. The option was available in MicroDrainage and i...
Dilraj KT over 2 years ago in InfoDrainage / Hydrology 1 Gathering support