Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks WS Pro

Showing 76

user defined boolean fields

Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system
Richard Robinson almost 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Set Area Codes- InfoWorks WS Pro

Add an "Exclude Selection List" option to the "set Area Codes" tool in IW WS Pro so that you can exclude selected links from the area code trace.
Daniel Alexander almost 6 years ago in InfoWorks WS Pro 1 Gathering support

Temperature variation for the PSO bulk chlorine decay model in the MSQ module of InfoWorks

The reactive-constituent (PSO) chlorine decay model (Fisher et al. 2017) was provided to users in the MSQ module of InfoWorks in July 2020 (see the MSQ blog for details). A major advantage of this model is that only a single set of four model coef...
Guest about 4 years ago in InfoWorks WS Pro / Engine 1 Gathering support

Sort selection sets/ re-order them

Would be very useful if you could either sort selection set orders or move selections up or down the list. This would make it much faster to find the selection set you want in a large list (e.g. DMA selection sets in alphabetical order)
Duncan Allen over 5 years ago in InfoWorks WS Pro 1 Gathering support

I want combine Critical Link Analysis with multiple scenarios

Today I can only select 1 scenario when running a critical link analysis run (or maybe general multi runs). I want to be able tot select multiple. This way, if I have 5 scenarios, I do not have to create 5 separate runs to check criticality of all...
Caroline Heylen about 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Copy all the scenarios from a Model

I would like to make a subsystem copy of a model (with different scenarios) that brings all the scenarios to the new model when I make a copy of the selected nodes and links. At this moment, a copy only brings the current scenario. Thanks
Juan Carlos Ortega about 3 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Field construction year reference for simulation run.

The field construction year of each object type from WS Pro are not linked to the simulation runtime, so you can get information for future infrastructures that you need to move away from your model or transfer to a new model or scenario. It wo...
Guest about 2 years ago in InfoWorks WS Pro / Engine 1 Gathering support

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest almost 6 years ago in InfoWorks WS Pro 0 Gathering support

The ability to create multiple Selection Lists at once

I am currently working on a model with a large number of DMAs. This means I have to select each specific area, and save this as a selection list - so I can easily identify areas in the future. This is a very time consuming task, and the ability to...
Sam Bonnington over 2 years ago in InfoWorks WS Pro / Automation 1 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest almost 5 years ago in InfoWorks WS Pro / Other 0 Gathering support