Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 347 of 1370

Assess scenarios based on annual water balance (runoff, infiltration, evaporation)

Assessment of the annual water balance is an important criteria to evaluate drainage design at neighbourhood level. Functionality to assess scenarios in a chart (similar to typical pre-urban vs. urban) would save time in GIS-postprocessing
Guest about 3 years ago in InfoDrainage 0 Gathering support

"Copy to clipboard" alongside print/export on Microdrainage spreadhseet input/outputs

Would greatly simplify the process of getting results/details from MD into a report, skipping a stage in the current process (Export to CSV/Excel - Open)
Guest about 3 years ago in InfoDrainage 0 Gathering support

to be able to change the default button in storm duration

to be able to change the default button in storm duration so I can set up my own default settings
Guest about 3 years ago in InfoDrainage 1 Gathering support

Please can the output drawings be able to be produced in landscape.

When using the extend view to produce drawings it appears to be only able to undertake in portrait. Also the title block cannot be changed in size which can make the drawings untidy. Finally can there be an option to move the lables around so they...
Guest about 3 years ago in InfoDrainage 1 Gathering support

Infiltration Basins

The output tables for ponds doesn't include any infiltration outputs where the pond is an infiltration basin. The graphs show that there is infiltration but MicroDrainage used to include infiltration in the output table
Guest about 3 years ago in InfoDrainage 2 Under consideration

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest about 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Import method specific Inflow parameters

With the various hydrology methods requiring additional parameters, it would be helpful to allow a feature to import these as GIS attributes. As methods such as SCS are widely used in the United States and require initial abstraction and curve num...
Sam Redway almost 2 years ago in InfoDrainage / Hydrology 1 Gathering support

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi almost 2 years ago in InfoWorks WS Pro / Other 0 For Review

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support