Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks WS Pro

Showing 108 of 1307

Model Build Automation Interface

Updating models from GIS and other sources requires a careful sequence of many steps that InfoWorks supports through various tools. However, scripting is the only way to assemble that in a repeatable seqeunce of tasks. As a modeler, I want a tool ...
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Automation 0 For Review

Creating Demand scaling from the Demand Area Window

In 2024.5 it is possible to choose to 'ignore leakage' and to 'scale demands' when using the demand area analysis tool. The scaling is happening on the demand (consumption) in the network. This means I have to create a new network (or scenario) ev...
Caroline Heylen over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Allow sequencing of simulations and selections lists

It would be good if we can change the sequence of the simulations, selection sets etc to make them easier to find - especially when creating different scenarios
Ashwini 3 months ago in InfoWorks WS Pro / Other 0 For Review

Toggle to sync view between Long Section and GeoPlan

I want an option to synchronize the view between the Long section and the Geoplan. When turned on, the geoplan will automatically zoom to the current visible set of links in my long section. If I zoom in/out on either the map or long section, the ...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Save and reuse GMR Report templates

When running multiple GMR runs with advanced reporting configurations, I want to save the report templates and re-use them across Runs.
Nathan Gerdts 10 months ago in InfoWorks WS Pro / Productivity 0 For Review

Improve Theme Symbol Support

While setting up a custom theme to align WS Pro more closely to our GIS, I've found the support for symbols quite limited, and think these would be worthwhile improvements: Support the use of custom SVG icons, and/or Support the use of non-system...
Dave Watts 3 months ago in InfoWorks WS Pro / Other 0 Gathering support

View time-varying profile count of impacted customers for criticality runs

Critical Link Analysis is powerful for understanding the summary impact of pipe closures/isolation, but sometimes the impacts are immediate and sometimes they're delayed several hours as reservoirs drain. The timing of customer outage impacts is u...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Ruby support for 'run_sql' method to return results

The method WSOpenNetwork.run_sql supports running a SQL query on the current network and results, e.g. to select and update objects in the network: Help | WSOpenNetwork | Autodesk. The current method cannot return the results of a SELECT query i.e...
Nathan Gerdts 11 months ago in InfoWorks WS Pro / Automation 0 For Review

Right click for graphs

I am a Bentley WaterGEMS user recently transitioning to InfoWorks WS Pro. While WaterGEMS has got its fair share of problems, the interface is very user friendly. For example: after you run the simulation, the graphs can be viewed just by a single...
Guest over 1 year ago in InfoWorks WS Pro / Productivity 1 Gathering support

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Operations 0 Gathering support