Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 442

Improve database and results files read performance

When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be li...
Peter Dunlop almost 4 years ago in InfoWorks ICM / Performance / Results 3 Gathering support

Ability to use variables in range RTC rules

For RTC range rules, we want to be able to use variables instead of constant values for the minimum and maximum values.
Guest almost 3 years ago in InfoWorks ICM / RTC 0 Gathering support

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden over 2 years ago in InfoWorks ICM / Scenario 0 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Commit history for scenarios

Commit history for scenarios Show an extra column in the commit history window to indicate how many scenarios exist in this version of the network. Ideally, there would be a button or column through which you can see the names of the scenarios for...
Annemie Vermeulen about 3 years ago in InfoWorks ICM / Scenario 1 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 7 months ago in InfoWorks ICM / Results 3 Gathering support

Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest almost 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Optimise Head / Discharge curves automatically for simulations

When simulating models, it is often necessary to consolidate the values in a H/Q curve to retain the hydraulic performance but optimize the simulation speed. As during previous correspondence with the InfoWorks support team, this has been advised ...
Tom Walker over 1 year ago in InfoWorks ICM / Orifice 2 Gathering support

Use tracers for water on mesh elements

Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. fr...
Marcel Glasbergen over 3 years ago in InfoWorks ICM / 2D Flooding / Visualization / Water Quality 1 Gathering support

Update Custom Graph functionality to cover more results

The current custom graph options, including Observed/Predicted and Flexible reports don't cover the full range of results available inside of ICM. This makes creating graphs and reporting the results difficult especially in the River and Water Qua...
Alex Grist about 1 year ago in InfoWorks ICM / Reporting 1 Gathering support