Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 202 of 1370

Add a new Special Query for "Demand Junctions" in the Domain Manager

Currently you have to either make your own tediously long query, or you can run a simulation and use output filters, but it should exist as a built-in Special Query.
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 1 Gathering support

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest 12 months ago in InfoWater Pro / Operational Modeling 1 Under consideration

Histograms

The first step toward industrial optimization is establishing a baseline performance. In plants, histograms visualize historical performance statically. The shape of KPI histograms allows quickly establishing operation performance, i.e. high varia...
Javier Coronado 10 months ago in Info360 Insight / Data 0 For Review

Default tank symbol

Can you change the default tank symbol color back to the dark blue that it used to be? The teal color is very light, making it difficult to see and hard to differentiate from the reservoir symbol. I know I can change this in preferences, but it wo...
Colin Ricks 10 months ago in InfoWater Pro / Productivity 0 Under consideration

InfoSurge velocity results

Please add pipeline velocities to the results for surge simulations. This really helps when designing surge tanks and connecting pipelines.
Guest 8 months ago in InfoWater Pro / Engine 1 For Review

"Initially Closed" and "Check Valve Direction" symbology should adhere to the "show inactive elements" toggle

This is simple enough to do by adding a definition query on the MOTYPE field in conjunction with the existing DSPCODE filter, but currently I would have to manually change this for 4 layers every time I toggle display of inactive elements.
Eric King 11 months ago in InfoWater Pro / Other 1 In progress

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Make Scenario Explorer window panes resizable to see long Data Set names

When you resize the Scenario Explorer window, the left side with the Scenarios gets larger but the right side with Data Set / Facility / General tabs does not widen, so you can't see long Data Set names without opening a separate window.
Grant Clemens about 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Status Transfer for Critical Channels in Info360 Plant

To enable Info360 Plant to transfer a "status" for channels, allowing users to establish when a critical channel is missing data. Current Situation: Info360 Plant currently has value mapping capabilities, but there are limitations: Setting the val...
Javier Coronado 9 months ago in Info360 Insight / Admin / Global Changes 0 For Review

Hydrant Available vs. Hydrant Design

Has anyone had issues with the hydrant available flow being less than the hydrant design flow? It has always been my impression that the hydrant available flow has less constraints and therefore would have a higher fire flow than that of the hydra...
Guest about 1 year ago in InfoWater Pro / Automation 1 For Review