Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 443

Compare WWG and TWG files

A tool to compare different WWG files and TWG files and report on the differences, similar to the Compare functionality for Networks.
Guest about 3 years ago in InfoWorks ICM / Import data 1 Gathering support

ICM sims updated with better control on sims outcome

I think waiting a big time for a sim to be done and then because the sim results disk gets full, loosing all of the simulated data is something that should be prevented from the time someone sends the simulation. A warning should be issued when yo...
Ionut Pintea over 5 years ago in InfoWorks ICM / Simulations 0 Gathering support

Add calibration criteria

Add in ability to review calibration in the model using calibration criteria such as those contained in the CIWEM COP
Guest over 3 years ago in InfoWorks ICM / Calibration 0 Gathering support

Implement the Inflow Time Series Scaling Factor in InfoWorks from ICM SWMM

Scale Factor In ICM SWMM or SWMM5 a multiplier is used to adjust the values of the constituent's inflow time series. The scale factor can have several uses, such as allowing one to easily change the magnitude of an inflow hydrograph while keeping ...
Robert Dickinson about 2 years ago in InfoWorks ICM / Flow 0 Gathering support

Apply rain gauge boundaries to multiple rainfall events

I would like to load rain gauge boundaries to multiple rainfall events at once. I have had to import rainfall profiles from .csv files and I have lots of durations and return periods. Saving the rain gauge boundaries to each file is time consuming...
Guest over 5 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Application of design storms in ICMLive

We'd like to be able to predefine some design storms in ICMLive (note that this is NOT the same as design rainfall in ICM). The idea is that we'd have these storms that could be optionally applied by operators to see the likely effect of a rainfal...
Richard Body over 5 years ago in InfoWorks ICM / Live Modeling / Rainfall 0 Gathering support

As a user i want to see 'failed' simulations within the Results Management Window rather than 'completed' status

When a sim completes as status Incomplete the sim icon changes to red and the Job control window states sim status Incomplete. However, in the Results Management window the sim status is ‘Complete’! For consistency and user friendliness; Please ...
Guest over 3 years ago in InfoWorks ICM / Reporting 0 Gathering support

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body over 5 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support

Update user defined vortex controls in ICM so hydrobrake head discharge curves can be modelled

Current user defined vortex controls don't accept head discharge curves where the discharge reduces for increasing head i.e. what happens in a hydrobrake. It would be useful to get this updated to ensure consistency between ICM and drainage design.
Guest over 5 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

compatibility with WMTS servers

Compatibility with WMTS servers for the GIS layer control would be very urgent. Right now a lot of data is only to project from WMTS servers.
Richard Wilbrink over 3 years ago in InfoWorks ICM / GIS Layers / Import data 0 Gathering support