Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 394 of 1372

Add the 'count of assets' under the Linear risk method (same as 5x5 matrix)

The 5x5 matrix provides a great summary on where pipes fall under the different 'buckets' this would be extremely useful for linear risk method as well as it helps the user determine their ranges dynamically.
Martha Nunez over 1 year ago in Info360 Asset / Risk 1 Under consideration

Add Simple Index Approach tool to InfoDrainage

It would be good if we we can get the "Simple Index Approach" tool inside InfoDrainage.
Dilraj KT over 2 years ago in InfoDrainage / Other 1 Gathering support

Ability to attach files to features in the Spatial layer

The specific use case on our end would be that we have an easements layer for the Districts and they would use it to have the record document (pdf) accessible by clicking on the easement feature.
Guest about 3 years ago in Info360 Asset / Customization / Styling / Data Management 1 Gathering support

Inference tool: Add a temporary asset ID to manholes without an asset ID.

When manholes do not have an asset ID it would be ideal to have Info360 Asset give a temporary asset ID so that the manhole can be imported and the inspection can be visualized in the map. Ideally, the user should be able to update the manhole ID ...
Martha Nunez over 1 year ago in Info360 Asset / Data Editing 1 Gathering support

Support for Vertical Assets

No description provided
Mike Maylone over 4 years ago in Info360 Asset / System Type / Asset Type 1 Gathering support

CCTV inspections should have their own data grid

This request is for a dedicated data grid in which CCTV inspection hearder details should be viewable. Inspections can then be filtered, sorted etc. Even better if this data grid could be hooked up to a dedicated asset condition map integrated wit...
Tony Andrews over 1 year ago in Info360 Asset / Data Editing / Inspection & Media Management Workflows / Map visualization / Product workflows 0 Gathering support

Integration with Lucity (Central Square)

Prioritized I360A action plan to be implemented and completed in CMMS - then once work is completed the equivalent work/project in I360A needs to be updated as complete. Different types of work orders for risk and rehab analysis, and for deteriora...
Martha Nunez over 2 years ago in Info360 Asset / Other 0 Gathering support

Enable drawnet manhole changes

Enable the manholes assigned to impermeable areas on drawnet to be changed. It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save...
Guest about 3 years ago in InfoDrainage 1 Already exists

Enable locking of pipe numbers

One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once i...
Guest about 3 years ago in InfoDrainage 0 Gathering support

Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest about 3 years ago in InfoDrainage 1 Already exists