Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 277 of 1372

Add the 'count of assets' under the Linear risk method (same as 5x5 matrix)

The 5x5 matrix provides a great summary on where pipes fall under the different 'buckets' this would be extremely useful for linear risk method as well as it helps the user determine their ranges dynamically.
Martha Nunez over 1 year ago in Info360 Asset / Risk 1 Under consideration

Ability to attach files to features in the Spatial layer

The specific use case on our end would be that we have an easements layer for the Districts and they would use it to have the record document (pdf) accessible by clicking on the easement feature.
Guest about 3 years ago in Info360 Asset / Customization / Styling / Data Management 1 Gathering support

Inference tool: Add a temporary asset ID to manholes without an asset ID.

When manholes do not have an asset ID it would be ideal to have Info360 Asset give a temporary asset ID so that the manhole can be imported and the inspection can be visualized in the map. Ideally, the user should be able to update the manhole ID ...
Martha Nunez over 1 year ago in Info360 Asset / Data Editing 1 Gathering support

Support for Vertical Assets

No description provided
Mike Maylone over 4 years ago in Info360 Asset / System Type / Asset Type 1 Gathering support

graph all sources on a singe graph in quality runs

The graphing tool in a quality run now only alows for two different sources. but I would like to know the consistency of water on any point in time of all defined scource nodes. E.G. the consistency of node X is 36% from source X, 13% from source ...
Pieter Piens almost 4 years ago in InfoWorks WS Pro / Water Quality 0 Gathering support

CCTV inspections should have their own data grid

This request is for a dedicated data grid in which CCTV inspection hearder details should be viewable. Inspections can then be filtered, sorted etc. Even better if this data grid could be hooked up to a dedicated asset condition map integrated wit...
Tony Andrews over 1 year ago in Info360 Asset / Data Editing / Inspection & Media Management Workflows / Map visualization / Product workflows 0 Gathering support

Integration with Lucity (Central Square)

Prioritized I360A action plan to be implemented and completed in CMMS - then once work is completed the equivalent work/project in I360A needs to be updated as complete. Different types of work orders for risk and rehab analysis, and for deteriora...
Martha Nunez over 2 years ago in Info360 Asset / Other 0 Gathering support

Allow sequencing of simulations and selections lists

It would be good if we can change the sequence of the simulations, selection sets etc to make them easier to find - especially when creating different scenarios
Ashwini 10 months ago in InfoWorks WS Pro / Other 1 For Review

add HL/1000 to graphs

When you create a graph object to graph data from objects for multiple simulations against each other, there is no option to add HL/1000 data. Everything else is there but HL/1000 is missing. Please add this to the list.
Ben Davies over 2 years ago in InfoWorks WS Pro / Other 0 Gathering support

Integration with Focus 3

Work order data integration from Focus 3 for risk and rehab models. Used in APAC
Michelle Mcmillan over 1 year ago in Info360 Asset 0 Gathering support