Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 656 of 1375

Add node level (hydraulic grade line) data to custom graphs for calibration

Allow for the ability to compare observed and predicted level data (or hydraulic grade lines) at nodes. Instead of depth in the pipe, I typically have water surface elevations at a node, specifically for treatment plant hydraulic modeling.
Guest over 5 years ago in InfoWorks ICM / Calibration / Labels / Results 0 Gathering support

Increased number of user pollutants

We would like to be able to trace pollutant sources through our 2D model. The way to do this would be to use the user defined pollutants . But... at the moment there are only four pollutants and potentially we'd have many different sources that we...
Richard Body over 5 years ago in InfoWorks ICM / Pollutants / Water Quality 1 Gathering support

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest about 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

Allow to add non-equidistance rainfall data

Allow to add non-equidistance rainfall data
Rowan De Costa over 1 year ago in InfoWorks ICM / Rainfall 2 Gathering support

AutoCAD objects on Conversion

As a user, I would like InfoWorks to recoginze Civil3D objects as objects and not require me to resolve the model to dumb elements
Guest about 6 years ago in InfoWorks ICM / Hydraulics / Import data / Terrain 0 Gathering support

Rework Graphic User Interface

I have used other Innovyze products with great success such as Infowater, InfoWater Pro, InfoSewer, and InfoSWMM. The GUI of these programs is intuitive and easy for me to pick as well as teach other members of my modeling team how to operate the ...
Guest over 2 years ago in InfoWorks ICM / Productivity 2 Gathering support

Need additional Timestep function for "Between episodes" of "Simulation runoff only"

It needs creating a new Timestep function in ICM Run window that allows setting up timestep for "Simulation runoff only" for the "Between episodes" separately with "Timestep (s)" in Run window. This new function saves a lot of running time when th...
Guest about 3 years ago in InfoWorks ICM / Events / Simulations 0 Gathering support

Play/Pause button

Current play and pause buttons (when viewing simulation results) are separate. I realise there are step buttons but if I want to start/stop quickly, whilst looking at the results instead of where the mouse is, then it's more convenient as a single...
Matthew Paul over 1 year ago in InfoWorks ICM / Productivity 0 Gathering support

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review

Enable time fields to be used in calculated value

For numeric user defined object fields set to time allow them to be used in the calculated value function in Mobile forms
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review