Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 175 of 1370

Live integration with ArcGIS Online

When updating a risk and rehabilitation model, users would like to make sure the data they are using is up to date. Much of this data such as roads, parcels, waterbodies, etc. comes from their GIS systems which get updated quarterly, semi-annual, ...
Martha Nunez over 1 year ago in Info360 Asset / Esri 1 On roadmap

Add a result grid window for cross sections

Currently there is not a grid results window to show all cross sections. Would be helpful to have one. Also would be good if the grid window can show geometric elements of each cross section, such as bank levels, flow area, wetted perimeter, hydra...
Guest over 4 years ago in InfoWorks ICM / Grids / Results 0 Gathering support

Ability to update and/or overwrite a spatial layer

Currently the user needs to delete the layer and re-import a new one. There should be an 'update' uption for all spatial layers.
Martha Nunez about 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 Gathering support

Customization of Grid Windows in InfoWorks ICM

Allow custom grid window layouts in InfoWorks ICM, much like the Property window. Allow the user to reorganize the columns, change the column widths, or hide unnecessary columns, and save it as a layout to be applied as a default.
Dave White about 6 years ago in InfoWorks ICM / Grids 9 Gathering support

Skeletonize water distribution asset network to simplify asset risk and rehab modeling

Don't want to do risk/rehab on all mains. Would like to aggregate / combine assets based on a set criteria and perform risk and rehab on those combined asset classes. Filter management does not quite work ATM.
Tony Andrews 11 months ago in Info360 Asset 0 Gathering support

Build your own expression for risk model total risk calculation

Specific request has come in from EPCOR. Requires follow-up As a user, I want to build my own expression when creating a risk model. For example, I want to bias the model myself and then normalize to 100. Total risk = ((LOF * 0.3) + (COF * 0.7)) *...
Mike Maylone over 2 years ago in Info360 Asset / Risk Configuration / Calculation 0 Under consideration

Map with bookmarks

One of the great things about a map is the ability to "quickly" jump from one area to another. We've somehow lost this basic function by utilizing the new mapping platform. I work for a utility that has both a north and south section with a huge c...
Guest over 1 year ago in Info360 Asset / Map tools 1 Gathering support

Export mesh ground levels to a ground model grid file

Using 2D mesh zones and mesh level zones can quickly get messy and difficult to visualise the changes that have been made and compare them to nearby ground levels. If there was a function to turn the ground levels of a mesh into a ground model gri...
Daniel Bloomfield about 1 year ago in InfoWorks ICM / Grids 1 Gathering support

Baseline Replacement Cost Tool

IAP has a very simple baseline replacement cost tool. It has been requested to be in Info360 Asset. Could be rolled into the deterioration modeling tool. https://help.innovyze.com/space/infoassetplanner/15794424/Baseline+Replacement+Cost
Tim Medearis about 2 years ago in Info360 Asset / Rehabilitation Planning 1 Gathering support

Sorting a conduit grid table based on upstream-downstream order (or vice-versa)

Help to sort a grid table (such as conduit) in order of upstream to downstream or vice-versa will be very helpful to modellers.
Guest over 2 years ago in InfoWorks ICM / Grids 0 Gathering support