Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 123 of 1372

IWLive Pro to adopt simulation periods of ICMLive

Each simulation has a hindcast period, now and a forecast period
Guest about 6 years ago in InfoWorks WS Pro 0 Gathering support

Local water quality settings.

User can set local water quality parameters and local initial condition of Water Quality in ICM rather than globally. Local WQ parameter should at least contain decay rate, DO process coefficient etc.. As for the local initial condition, DO concen...
Liu Qiusheng about 6 years ago in InfoWorks ICM / Pollutants / Water Quality 1 Gathering support

"jet flow" and agitation (inflow with a certain speed)

In China, efforts are being made to improve black and smelly water bodies. One of the measures is to increase water fluidity to improve water quality through natural purification of water bodies. So there are two measures to increase the fluidity ...
Liu Qiusheng about 6 years ago in InfoWorks ICM / 2D Flooding / Pollutants / Water Quality 0 Gathering support

Pollution from the rainfall

No description provided
Liu Qiusheng about 6 years ago in InfoWorks ICM / Pollutants / Rainfall / Water Quality 2 Gathering support

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration

Change the default colour of the background from white to other colours

Change the default colour of the background from white to other colours to help the user interface and improve the user experience.
Guest over 4 years ago in InfoWorks WS Pro / Other 0 Gathering support

Provide a Standard Warehouse of new assets

Allow the company that is running the software to define a standard warehouse of new assets so the modellers using it know the assets they are adding have the settings (diameters) of the actual assets or pipes that particular company uses.
Guest over 4 years ago in InfoWorks WS Pro 1 Gathering support

I have been testing your export features using a number of simulation results with a selection set. This does not work as it is supposed to

Results export to CSV does not work with selection sets, it always just exports all of the network
Guest over 5 years ago in InfoWorks WS Pro 0 Will not implement

Hyperlinks to specific pages within a document, not just the file/folder

When adding hyperlinks to features within the properties, enable the ability to link to a specific page within the document itself rather than just opening the document on the first page or folder.
Guest over 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

allow multiple selection lists in a shutdown simulation

I am currently working on a long-term planning of our pipeline renovation projects. I need to determine which projects can be executed simultaneously. My approach at this time is to create a selection list of all the pipes that would be taken out ...
Guest over 5 years ago in InfoWorks WS Pro 0 Will not implement