Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 320 of 1372

Include weirs and orifices in xpswmm ensemble statistics

Please include weirs and orifices in the ARR Ensemble Statistics summary. Currently, only conduits or natural channels are included.
Guest about 5 years ago in InfoWorks ICM / Results 0 Gathering support

ILSAX Runoff Method

ILSAX is a public domain MS-DOS program developed from the South African ILLUDAS-SA program, which was itself a development of the American ILLUDAS program and the British Transport and Road Research Method (known as the TRRL or RRL model). It was...
matthew.piggott over 1 year ago in InfoDrainage / Hydrology 1 Gathering support

Add node level (hydraulic grade line) data to custom graphs for calibration

Allow for the ability to compare observed and predicted level data (or hydraulic grade lines) at nodes. Instead of depth in the pipe, I typically have water surface elevations at a node, specifically for treatment plant hydraulic modeling.
Guest over 5 years ago in InfoWorks ICM / Calibration / Labels / Results 0 Gathering support

Add Simple Index Approach tool to InfoDrainage

It would be good if we we can get the "Simple Index Approach" tool inside InfoDrainage.
Dilraj KT over 2 years ago in InfoDrainage / Other 1 Gathering support

Need additional Timestep function for "Between episodes" of "Simulation runoff only"

It needs creating a new Timestep function in ICM Run window that allows setting up timestep for "Simulation runoff only" for the "Between episodes" separately with "Timestep (s)" in Run window. This new function saves a lot of running time when th...
Guest about 3 years ago in InfoWorks ICM / Events / Simulations 0 Gathering support

Enable drawnet manhole changes

Enable the manholes assigned to impermeable areas on drawnet to be changed. It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save...
Guest about 3 years ago in InfoDrainage 1 Already exists

Enable locking of pipe numbers

One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once i...
Guest about 3 years ago in InfoDrainage 0 Gathering support

Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest about 3 years ago in InfoDrainage 1 Already exists

InfoDrainage - Time of entry to be called time of entry, not time of concentration

Te has specific meaning in the UK when using the rational method (modified). Tc also has speific meaning (Te + sumTf). It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of conc...
Guest about 3 years ago in InfoDrainage 0 Gathering support

InfoDrainage - replace stormwater outline with DXF (or other similar file)

Would be useful to be able to 'replace outline' of a stormwater control by importing a polygon (e.g. DXF, SHP etc), rather than the existing options which are just to redraw in ID only. Every project there seems to be need to replace an outline fr...
Guest about 3 years ago in InfoDrainage 1 Already exists