Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 262 of 1372

ARR critical storm analysis in Comparison Report

Please update the comparison report feature in InfoDrainage to allow ARR design storms - critical storm per drainage element. We currently cannot compare phases when using ARR storms.
matthew.piggott 7 months ago in InfoDrainage / Reporting 0 For Review

Sewer Design - Area Density Method

Area Density method is recommended to be incorporated in Infodrainage as it offers improved accuracy and aligns with Indian flow calculation standards which could enhance the reliability of the outputs. This method is described in Indian Guideline...
matthew.piggott 7 months ago in InfoDrainage / Other 1 For Review

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest about 3 years ago in InfoDrainage 1 Gathering support

Allow export of user flags via ruby

As a WaSC we hold our models in a central model library and need to ensure our default flags are utilised, and the descriptors are not amended. we have automated the comparison as far as possible but the flags within any new Db have to be manually...
Richard Robinson 10 months ago in InfoWorks ICM / Export Data 0 For Review

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest 10 months ago in InfoDrainage / Data Exchange 0 For Review

Flooding extents boundary

Would like the ability to export the maximum 2D flooded boundary so I can show this in Civil 3D.
Guest 10 months ago in InfoDrainage / 2D Flooding 2 Already exists

Tree Pits

Add Tree Pits as a type of SuDS structure.
Guest about 3 years ago in InfoDrainage 2 Under consideration

Change default field name behaviour when exporting to shape file

When exporting model network data to shapefile format, the default export field names generated in the “open data export centre” are currently very awkward. The issue arises because many field names in ICM are longer than ten characters, but shape...
Jason Kulsdom over 1 year ago in InfoWorks ICM / Export Data 2 Under consideration

Allow no delay connections with a free flow outlet option instead of automatic orifice nodes.

Currently when flows from a pipe with a free outlet node is diverted to a different location via a no delay connection, the free flow outlet automatically changes into an orifice, which in fact does not exits there. This orifice also needs a manua...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner almost 2 years ago in InfoDrainage / Hydrology 2 Already exists