Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1374 of 1374

Multiple Conduit Selection

The Select downstream (or upstream) links button is of limited use. Typically, I would like to select all downstream CONDUITS, in order to create a long section, but I find ICM arbitrarily include overland links (curb & gutter) between nodes a...
Gregory Smith almost 4 years ago in InfoWorks ICM / Long Section / Profile / Productivity 0 Gathering support

InfoAsset Planner - Create Sub Groups in Operation Center

Allow Analyses, Toolbox Reports and Data Miners to be sub-grouped in Operation Center Tabs. This would help with keeping track of what goes where and simplify workflow when working on multiple, independent evaluations or evaluations with multiple,...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

As a company we wish to trace live / assets. our Networks include abandoned assets resulting in incorrect traces urrent traces h

option switch to exclude closed / abandoned assets from searches. searches being undertaken in InfoAssetOnline currently identifing incorrect list of u/s or d/s assets viewed.
Richard Robinson almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Send link to user email to download report/data export from platform.

Customer Feedback: Exporting data out of the platform under the Reporting feature or data exports was a big concern, given that users could access the tool from a browser on any machine. The current proposed fix is to have the platform send a link...
Guest almost 2 years ago in Info360 Insight 0 For Review

Export results to CSV/Database with a more flexible selection list in ICMLive

In ICMLive, we can now export results to CSV/Database with a pre-defined selection list. In ICM, we can have a more flexible way. For example if I hope to export results point (2D), initially I may have 1 million points. What we can do in ICM is, ...
Guest about 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Re-triggering CCTV association when the GIS is updated

Sometimes when the CCTV and GIS don't match, the problem is the GIS. In Info360 Asset users can find unassociated inspections so they have to update the GIS. When updating the GIS in Info360 Asset the inspection will not automatically re-associate...
Martha Nunez about 2 years ago in Info360 Asset 0 In progress

Calculatiton speed with diffusion needs to improve.

Diffusion will seriously slow down the model culculation. But generally the water quality models have to run for several years. With current simulation speed that would be unlikely to do a water quality simulation with diffusion.
Liu Qiusheng about 6 years ago in InfoWorks ICM / Info360 Cloud  / Pollutants / Water Quality 0 Gathering support

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 2 years ago in InfoWorks ICM / Results 2 Already exists

Publish InfoWorks WSPro critical link analysis module results to Info360 Insight - Incident Manager (building on work done in Info360 Asset)

With the InfoWorks WSPro Critical link analysis module results being made available within Info360 Asset for criticality/risk calculations - these results could potentially be valuable to operations in an incident or pipe break scenario (number of...
Patrick Bonk about 2 years ago in Info360 Insight / Incident Manager 0 Under consideration

Include Modified Rainfall Frequencies and Distributions from Harris County Flood Control District in the NOAA Atlas 14 Storm Generator

No description provided
Guest about 4 years ago in InfoWorks ICM / Rainfall 0 Gathering support