Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Infoworks ICM - Contours and Labels

Infoworks - ICM Contours with labels to be shown on ground model
Guest almost 6 years ago in InfoWorks ICM / Terrain 1 Gathering support

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest over 3 years ago in Other Product Ideas / Asset Management 5 For Review

Add the 'count of assets' under the Linear risk method (same as 5x5 matrix)

The 5x5 matrix provides a great summary on where pipes fall under the different 'buckets' this would be extremely useful for linear risk method as well as it helps the user determine their ranges dynamically.
Martha Nunez over 1 year ago in Info360 Asset / Risk 1 Under consideration

Enable drawnet manhole changes

Enable the manholes assigned to impermeable areas on drawnet to be changed. It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save...
Guest over 3 years ago in InfoDrainage 1 Already exists

Enable locking of pipe numbers

One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once i...
Guest over 3 years ago in InfoDrainage 0 Gathering support

Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest over 3 years ago in InfoDrainage 1 Already exists

InfoDrainage - Time of entry to be called time of entry, not time of concentration

Te has specific meaning in the UK when using the rational method (modified). Tc also has speific meaning (Te + sumTf). It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of conc...
Guest over 3 years ago in InfoDrainage 0 Gathering support

InfoDrainage - replace stormwater outline with DXF (or other similar file)

Would be useful to be able to 'replace outline' of a stormwater control by importing a polygon (e.g. DXF, SHP etc), rather than the existing options which are just to redraw in ID only. Every project there seems to be need to replace an outline fr...
Guest over 3 years ago in InfoDrainage 1 Already exists

Improved tutorial for setting up a network

InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullie...
Guest over 3 years ago in InfoDrainage 1 Under consideration

Enhance InfoDrainage Long Sections

No description provided
Guest over 3 years ago in InfoDrainage 1 In progress