Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest over 3 years ago in InfoDrainage 1 Already exists

InfoDrainage - Time of entry to be called time of entry, not time of concentration

Te has specific meaning in the UK when using the rational method (modified). Tc also has speific meaning (Te + sumTf). It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of conc...
Guest over 3 years ago in InfoDrainage 0 Gathering support

InfoDrainage - replace stormwater outline with DXF (or other similar file)

Would be useful to be able to 'replace outline' of a stormwater control by importing a polygon (e.g. DXF, SHP etc), rather than the existing options which are just to redraw in ID only. Every project there seems to be need to replace an outline fr...
Guest over 3 years ago in InfoDrainage 1 Already exists

Improved tutorial for setting up a network

InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullie...
Guest over 3 years ago in InfoDrainage 1 Under consideration

Enhance InfoDrainage Long Sections

No description provided
Guest over 3 years ago in InfoDrainage 1 In progress

Sewer Design - Locking gradients

It would be useful if you could lock sewer gradients or manhole relationships so that if you changed an upstream level it would automatically amend downstream levels
Guest over 3 years ago in InfoDrainage 1 Gathering support

Initial condition 1D setting value

For Initial Conditions 1D, InfoWorks ICM seems to specify 1) initial level(m AD) and inflow values at nodes for Nodes grid, 2) and initial depth (m) and flow values along the river reach for River Reaches grid. For river reaches grid, as an initia...
Guest almost 2 years ago in InfoWorks ICM / InfoWorks 1 Will not implement

Support variable speed in live data

Variable speed is now an unsupported attribute in live data.
Evi Loozen about 6 years ago in InfoWorks WS Pro / Telemetry 2 Under consideration

Modelling of mud and other non-Newtonian flows

We've a lot of work at the moment modelling the failure of tailings dams. Tailings dams typically have material that acts in a non-Newtonian manner. To effectively model these sorts of fluids would require the inclusion of additional fluid propert...
Richard Body about 6 years ago in InfoWorks ICM / Hydraulics / Sediment 0 Gathering support

ICM - HEC-22 Combination Inlet for continuous grade inlets

Currently ICM has 6 FWHA Gully Inlet types: ContCo Continuous Curb Opening ContG Continuous Grate SagC Sag Combination SagCO Sag Curb Opening SagG Sag Grate and UPC Grate A commonly used Inlet type (particularly in QLD Australia) that is missing ...
Guest over 3 years ago in InfoWorks ICM / Hydraulics 0 Gathering support