Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 161 of 1370

INTERLIS format importer of XML data for CCTV and Manhole Survey data

Support the importation of INTERLIS format XML data of CCTV and Manhole Survey data
Krzysztof Tchorzewski 7 months ago in Other Product Ideas / Asset Management 0 For Review

Enable Reference Graph type "Output from other sources" for Group Graphs

On a single element graph, you can use Reference Graph - Output from other output source(s) to compare results for that element from various scenario runs. This option should also be enabled for Group Graphs on multiple elements.
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

PACP Split Survey observations enhancements

The issue is when the application is asked to split a survey and the survey is a PACP inspection, NASSCO expects a few things to be on the inspection. First, the first code on the inspection should be AMH with remarks (this could be the node that ...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd about 2 years ago in Other Product Ideas / Asset Management 0 For Review

Closed surge tank initial water level

would be nice for the surge program, is to have the initial water level automatically calculated for closed surge tanks
Guest about 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Splitting pipe - surge wave speed not inherited

When splitting a pipe by inserting a node, the new pipe inherits the attributes of the original pipe (diameter, roughness, zone, material, etc). However, if the pipe has a wave speed assigned for surge modeling, the new pipe does not inherit the w...
Colin Ricks about 2 years ago in InfoWater Pro / Productivity 1 In progress

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest about 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

Incorporate greater flexibility in the creation of UDF maps from the Print Field Journal

The current Print Field Journal for UDF maps does not allow users to adjust the map size (relative to other elements in the PDF), which was an important feature for our client when using UDF with InfoWater (the map is the most important for them i...
Guest 10 months ago in InfoWater Pro / Productivity 0 For Review

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review