Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 278 of 1370

Assign A Unique Color for Each Catchment

it would be helpful if we could assign a unique color for each catchment instead of one color for all catchments with that I can assign for example brown for the catchments with the percentage impervious 100% and green for those with the percentag...
Guest about 2 years ago in InfoDrainage / Visualization 1 Gathering support

Data Exchange for Revit

It would be useful to provide a seamless data exchange with other Autodesk products rather than just C3D - specifically Revit. On an architectural scale project, we often dont use a package like Civil 3D so being able to carry out drainage design ...
matthew.piggott 4 months ago in InfoDrainage / Data Exchange 0 For Review

Video generation of InfoDrainage simulations

Requesting the ability for InfoDrainage to export simulations to .mp4 or .avi files for distribution and review. Right now, you can play the simulation in InfoDrainage, but need a screen capture software to record the results into the video for ex...
Tim Medearis 7 months ago in InfoDrainage / Reporting 1 For Review

Ability to look at multiple phases (surface and foul networks together) in 3D

Being able to view both surface and foul networks within MicroDrainage was always a very useful feature to visualise crossing points in the network and it doesn't look to have been included in InfoDrainage.
Henry Wilkinson 7 months ago in InfoDrainage / Productivity 1 For Review

Option to "remember my choice" on the Query Set Cache pop-up

The pop-up asking whether to use the cache or re-run Query Sets every time you switch scenarios can get annoying. It would be nice to have a checkbox that says "always re-run queries" or something to that effect so that this pop-up can be suppressed.
Grant Clemens about 1 month ago in InfoWater Pro / Productivity 0 For Review

Easily transform node from one type to another

Self explanatory. Use a user selection or domain.
Colin Ricks 10 months ago in InfoWater Pro / Productivity 1 Under consideration

Results tables to be ordered from most upstream junction/connection to outfall

As per the title, currently the results tables are presented in numerical order - which doesn't always make sense when interpreting the results. I.e should be presented in the same order they were in Microdrainage.
Guest about 1 year ago in InfoDrainage / Reporting 0 For Review

Order Junction & Connection Results Printout by Flowpath (to match the Model Printout)

Issue: When using the 'print' feature, if a flow path is selected, the model summary for junctions will show ALL connected pipes, in 'flow' order, which is very useful for presenting/understanding data. However, in the results tab for connections,...
Alex Purcell over 1 year ago in InfoDrainage / Reporting 0 For Review

InfoSurge constant reporting interval

Often, different InfoSurge runs report results at different intervals, even though the simulation duration is the same. This makes it difficult to do comparisons of results. Please allow the user to set a report timestep like you can with a standa...
Colin Ricks 3 months ago in InfoWater Pro / Productivity 0 For Review

Save phase results seperately

When working with multiple phases I would like to be able to run one phase (exclude all others from analysis) and have the results saved. Results should only be overwritten when a new run on the same phase is completed.
Andrew Komarnycky 11 months ago in InfoDrainage / Productivity 0 For Review