Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King about 1 year ago in InfoWater Pro / Other 0 For Review

Use consistent terminology in the Fireflow Results Report

The Fireflow Results Report uses the following terms for what I believe are the same thing: Total Demand, Design Flow, & Fire Demand. If these are not the same in the context of this report then explain their differences. Also, the term "Hydra...
Guest 12 months ago in InfoWater Pro / Other 0 For Review