Showing 18 of 1370

Report manager should populate without running model

Currently, the report manager is only populated once results are shown. This makes it so that the only place I can view the model data before running, is the data base manager. You should be able to have the report manager populated without runnin...
Endrit Shabani almost 2 years ago in InfoWater Pro / Other 0 Gathering support

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King 11 months ago in InfoWater Pro / Other 0 For Review

Sensor Objects for maps and comparisons

I want to see and interact with my sensors on the map. These could be generated from existing Live Data Points on model objects, and/or imported from GIS and joined spatially to model objects. Sim results could store the sensor data for the Run pe...
Nathan Gerdts about 1 year ago in InfoWorks WS Pro / Telemetry 0 For Review

Populate Pump run schedule based on telemetry data in WS Pro

As a planning modeler calibrating within WS Pro, I want to use the "Load from Live Data" tool on pumps in Plan mode to populate the Control Data timeseries profile based on a data stream of 1's and 0's indicating on/off. While this is already avai...
Guest over 4 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Specify number of demands

I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
Colin Ricks almost 6 years ago in InfoWater Pro / Other 3 Under consideration

Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support

Apply two-valve isolation for criticality analysis

For some projects we need to isolate the repair area with two closed valves in all directions in case one valve were to fail. Please incorporate this as an option in criticality analysis when summing affected customers
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support

User guide and example for Sustainability Module in InfoWater

I'm currently trying to figure out how to use the Sustainability Module and ensure my results are reasonable and it would be handy if like other modules it has a test module with documentation and tutorials.
Guest almost 6 years ago in InfoWater Pro / Other 0 Under consideration