Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 18 of 1370

Include an "excluded search nodes" warning in fireflow output table

When the design pressure exceeds the static pressure at a particular node, that node will be excluded from a design fireflow model run. The output table should include a banner at the top listing the excluded nodes, as these can make a big differe...
Guest over 4 years ago in InfoWater Pro / Engine 0 In progress

inlet riser option for tank

Have an option to specify an Inlet Riser Pipe for the tank element. This would hold the fill head at a constant, set at the riser pipe elevation, but allow the tank discharge head vary with the tank level.
Guest almost 5 years ago in InfoWater Pro / Engine 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Operations 2 Will not implement

Automate concurrent Fireflow simulations

When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possibl...
Guest about 6 years ago in InfoWater Pro / Engine 0 Gathering support

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration

CAM Enhancement

CAM Enhancements A few things to consider that I think would make your tool better than others I have seen/used: 1. The ability to export the pounded areas into GIS. It seems to me this shouldn’t be difficult as you are color coding them now in ...
Guest about 5 years ago in InfoWater Pro / Engine 0 Under consideration

A simple way to get an upstream or downstream trace analysis for all objects (node or pipe)

In WS Pro Upstream/downstream tracing is easy for a single object. Obtaining a single useful value (i.e. property count) is easy for multiple objects. Combining the two is very difficult at the moment in WS Pro I want to be able to obtain, eithe...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support