Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 216 of 1370

Add more fields to tables and CSV exports

Can the Asset ID column (in addition to the Pipeline Ref. column) be included in the .csv export for the inspection list? We use this data often for our reports and having the linked GIS Asset ID would be necessary to analyze the inspection data. ...
Nicholas DelReal 28 days ago in Info360 Asset / Data Export 0 In progress

InfoAsset Online - Grid Sorting

When a selection of schedulable objects is made they are not ordered. They should be ordered preferably by the date completeled, with the latest survey at the very top of the grid.
Idris Nujjoo 6 months ago in Info360 Asset / General 3 Gathering support

To use the results from one rehab tree as a query in another rehab tree

There is a need to be able to query if a pipe has been flagged for a rehab action in one rehab tree so it can be excluded in a second rehab tree
Michelle Mcmillan 11 days ago in Info360 Asset 0 For Review

Incorporate the NZ Pipelines Inspection Manual 4th Edition into Info360 Asset

We currently use InfoAsset to record our CCTV inspections and we rely on the NZ Pipelines Inspection Manual 4th edition for the scoring. We are interested in migrating across to Info360 Asset but until this has been incorporated into the product w...
Guest 7 months ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

Enable Workgroup products to perform a pivot calculation using SQL

Currently it is possible to perform an SQL query on 2 or more data fields e.g., SELECT SUM(length) AS "Pipe Length (m)" GROUP BY pipe_class AS "Pipe Class", user_text_9 AS "Pipe Size Category" This will produce a long list of grouped combinations ...
Tony Andrews 3 months ago in Info360 Asset 1 Gathering support

Ability to conduct batch edits in CCTV inspection page

Currently, the user can make manual updates to CCTV inspections. However, in many cases they will want to edit inspections in batch. One common example is the Us/DS manholes do not match for hundreds (even thousands) of inspections. Rather than de...
Martha Nunez about 1 year ago in Info360 Asset / Data Editing / Inspection & Media Management Workflows 0 Gathering support

Support for ArcEngine Functions for background layers (no x32 bit support)

The current x64 version of ICM cannot use the ArcEngine / ArcGIS Desktop funcionality, in contrast to previous x32 bit versions of ICM. Since only x64 bit version is now supported, this feature cannot be used. It is one of the most important featu...
Elliot Egan about 2 years ago in InfoWorks ICM / GIS Layers 1 In progress

InfoAsset Manager - Add more reports to Ruby Exchange method

Currently Ruby supports the following generation of reports:The Reports which are supported and generated via this method are: Manhole Report - ['cams_manhole',nil] Manhole Survey Report - ['cams_manhole_survey',nil] CCTV Survey Report - ['cams_cc...
Anthony Andrews 23 days ago in Info360 Asset / Reporting 0 For Review

Automated data synchronisation

We need to have the ability to do automated data synchronisation so our users don't have to do the manual import all the time for data updates.
Michelle Mcmillan 3 months ago in Info360 Asset / Asset / Spatial Data Import 0 For Review

possibility to connect labels to links at the beginning or end instead of only in the middle of the link

This way you can show that link invert levels on a manhole differ in value or deviate from the chamberfloor
Loes van der Linden 10 months ago in InfoWorks ICM / Labels 3 Already exists