Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 144 of 1370

Detention Time Modelling

We would like the model to calculate detention time of sewer in a simulation. The idea is similar to water age calculation in WS. The aim is to use this as a proxy for odour study, in essence we would like to be able to create thematic maps to sho...
Guest about 5 years ago in InfoWorks ICM / Reporting / Results / Wastewater 0 Gathering support

XPSWMM with TUFLOW 2023 Latest Release

XPSWMM 2024.2 is using an OUT OF DATE TUFLOW engine that will not finish 2D simulations! UPDATE THE ENGINE
Guest over 1 year ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 For Review

would like whether summer or winter event to be automatically exposed in sim title

would like whether summer or winter event to be automatically exposed in sim title so when undertaking RPA analysis for both summer and winter events this is exposed automatically rarther than having to rename sims prior to running RPA
Richard Robinson about 4 years ago in InfoWorks ICM / Rainfall / Reporting 0 Gathering support

Collapsing walls identified in the log file

Can we have the status of base linear structures included in the log file? I have a large model where I have lots of these and I need to interrogate each one in turn. It would be much easier if the log file (or, better still, a grid view) showed t...
Richard Body over 5 years ago in InfoWorks ICM / Reporting / Visualization 0 Gathering support

InfoAsset Online - "Sort by the date" option in selection grid

If there is a way to put the surveys which are part of a Work Package search into date order, It would be beneficial to our users. Some of our jobs involve several visits and it would be better for the user to be able to see the latest surveys at ...
Guest over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Graph sum of multiple objects instead of each selected object

While looking at multiple drainage areas in a basin (in my example), results can become hard to read; it would be nice if you could graph multiple objects and have the option to see the summation of the selection instead of each individual item.
Andrew (AJ) Czubai almost 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest about 6 years ago in Other Product Ideas / Asset Management 1 For Review