Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 173 of 1370

As a user I want to be able to adjust dry weather flow diurnal profiles easily to account for day light savings

Diurnal wastewater and tradewaste profiles shift over the course of the year due to day light saving time adjustments. I would like to see ICM include the ability to phase shift the diurnal patterns to account for DLS. I believe this adjustment wo...
Guest about 3 years ago in InfoWorks ICM / Calibration 3 Gathering support

Attach reports (pdfs) to asset

We sometimes get inspection data in a pdf format and other times we may have a write up on the condition of the asset. It would be useful to attach this to the asset.
Lauren de Bude 5 months ago in Info360 Asset / Import / Upload 1 Gathering support

Automated Data Exchange with InfoAsset Manager

If we think of asset management as divided into day-to-day work and organization (InfoAsset Manager) and long term, CIP planning work (Info360 Asset), this idea would bring asset management full circle. It'd also provide a huge workflow benefit fo...
Tim Medearis about 2 years ago in Info360 Asset / Integrations 3 Under consideration

Create a stormwater system type

It would be useful to be able to manage stormwater networks separately from sewer
Brad Thompson over 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 In progress

Stub out CCTV Lateral Defects

In InfoAsset Planner, the CCTV data for laterals was stubbed out and drawn into the GIS as a polyline. In Info360 Asset, these 'defects' are still visualized only as a point on the pipe, as an 'X'. Seeing the laterals is extremely valuable and 'pa...
Tim Medearis about 2 years ago in Info360 Asset / Map visualization 3 Gathering support

Expanded PACP code Risk queries (count of defects, clock pos, value%, length, etc)

The NASSCO standard provides a good scoring system for sewer pipes. However, when cities have a large percentage of pipes in poor condition, it is difficult to prioritize the work by solely looking at the NASSCO score. In some cases a utility migh...
Martha Nunez over 1 year ago in Info360 Asset 0 On roadmap

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Support for ArcGIS Enterprise Portal (public)

Integrate with ArcGIS Enterprise Portal
Mike Maylone over 2 years ago in Info360 Asset / Esri 6 In progress

Labeling manhole and pipe IDs in the Map

It makes it easier to QAQC data, or simply determine which asset it being viewed in the Map.
Martha Nunez about 2 years ago in Info360 Asset / Data Management 3 On roadmap

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest over 4 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support