Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 192 of 1370

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest about 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

Use consistent terminology in the Fireflow Results Report

The Fireflow Results Report uses the following terms for what I believe are the same thing: Total Demand, Design Flow, & Fire Demand. If these are not the same in the context of this report then explain their differences. Also, the term "Hydra...
Guest 9 months ago in InfoWater Pro / Other 0 For Review

Evaluate Fireflow Minimum Pressure by Zone

In the drop down menu for the Critical Node Search Range, please add the option to evaluate minimum pressure based on the same zone. Or add an option to consider multiple search areas where the user can select either the entire system and/or by zo...
Joe Lawrence over 4 years ago in InfoWater Pro 0 Gathering support

Export InfoSurge results for external application

InfoWater can use the option to "Export simulation results for external application" to export selected results to DBF files. It would be nice to have this work for InfoSurge.
Colin Ricks over 4 years ago in InfoWater Pro 1 Gathering support

Incorporate greater flexibility in the creation of UDF maps from the Print Field Journal

The current Print Field Journal for UDF maps does not allow users to adjust the map size (relative to other elements in the PDF), which was an important feature for our client when using UDF with InfoWater (the map is the most important for them i...
Guest 10 months ago in InfoWater Pro / Productivity 0 For Review

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review

Enable time fields to be used in calculated value

For numeric user defined object fields set to time allow them to be used in the calculated value function in Mobile forms
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review

Allow radio buttons to be unchecked

Allow users to uncheck a radio button if it has been accidentally checked
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review

Limit the number of check boxes able to be checked

Enable users to put a cap on the number of check boxes that can be checked
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review