Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Optimizing Asset Management with Classes in Info360 Plant

Currently, in Info360 Plant, when creating a common analytic or workspace for the same type of asset (e.g., a pump or a set of pumps), it is necessary to manually create the analytic or workspace for each asset. This process is facilitated through...
Javier Coronado about 1 year ago in Info360 Insight / General 0 For Review

Initial Tank Levels

It would be great to be able to change the initial tank levels without having to create a whole new tank data set or putting a duplicate tank in the current data set. That way, the initial tank level condition can be changed for any given scenario...
Guest over 6 years ago in InfoWater Pro / Operational Modeling 4 Will not implement

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support

By default display ID in alphabetical order in Control Center Overview in InfoWater Pro

By default display ID in alphabetical order in Control Center Overview in InfoWater Pro
Mickey Liu about 1 year ago in InfoWater Pro 0 Gathering support

Move the Refresh Output checkbox

Refresh Output should be checked 99.9% of the time, if you accidentally uncheck it then you might unknowingly look at old results Map Displays do not update. Can this checkbox be moved to somewhere not in the Model Explorer so it is less likely to...
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Consistent names and icons

Use the same name for things everywhere. For example, in the Model Explorer there is a "Modeling" section. In the DB editor, the field listed in the "Modeling" section are found in the "Hydraulic data" tables. Icons are also often different in dif...
Colin Ricks about 1 year ago in InfoWater Pro / Productivity 0 For Review

Batch run should work for run types other than standard

Batch run can only do standard runs. It is currently not possible to do fire flow, surge, pipe break, etc., as batch. Maybe add "Simulation type" to the General tab of the scenario explorer?
Colin Ricks about 1 year ago in InfoWater Pro / Productivity 0 Gathering support

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd over 2 years ago in Other Product Ideas / Asset Management 0 For Review

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King about 1 year ago in InfoWater Pro / Other 0 For Review

arcgis pro as map control

Can we please add the ability to use ArcGIS Pro as an option in the Map Control of InfoAsset Manager?
Guest over 4 years ago in Other Product Ideas / Asset Management 0 Will not implement