Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

InfoAsset Planner - Data Miner Automation

Data Miner Automation. As a user, I'd like to be able to call on and run other tools from the Data Miner. (i.e run pre-set analysis from the Analysis Tab - LoF, CoF, Risk, Rehab Plan, etc) This will allow me to create more complex analysis work...
Guest about 6 years ago in Other Product Ideas / Asset Management 0 For Review

CCTV Wizard output

The CCTV wizard Geocode Pipe Survey Data function is great. As a user, I want the output pipe length of connection layer to be 10 feet or less instead of 15 feet, because we have mainlines are close and parallel to each other, currently the connec...
Guest about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Set Up and Run a Multi-Parameter on Top of a Multi-Parameter

We would like the ability to set up and run a multi-parameter on top of another multi-parameter. This will eliminate a LOT of outside Excel and GIS work and allow us to calculate these particular CoFs and LoFs all within InfoAsset Planner.
Guest about 6 years ago in Other Product Ideas / Asset Management 0 For Review

CoF and LoF Score Bubble Scale

Our maximum score for both CoF and LoF is only a 5, but the CoF and LoF bubbles in the Facility Explorer appear to be default set at 10. At a glance, it is very confusing to most people who aren't engrossed in the model. We would like the ability ...
Guest about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Improved Method to export videos / graphics from ICM

This suggestion is from NYC DEP. We would like the ability to more easily export results from ICM in video or picture format.
Guest about 6 years ago in InfoWorks ICM / Export Data / Theme / Visualization 1 Gathering support

InfoAsset Planner - COF/LOF Wizard Pipe Inventory Table Join on Column other than FacilityID

During "Step 3 - Set Parameter (Pipe Inventory)" I would like to be able to join the Internal/External table using an InfoAsset Planner column other than the "FacilityID". For example it would be great to also have the option of using the "LegacyI...
Bradley Nissley about 6 years ago in Other Product Ideas / Asset Management 0 Will not implement

Import 12da Drainage Design strings and attributes to InfoWorks ICM to migrate drainage designs

No description provided
Guest about 6 years ago in InfoWorks ICM / Import data 0 Gathering support

Create preset 2D inflow equation

Similar to inlet capacity, have the ability to create 2D inflow equations relative to inlet size and control depending on weir or orifice curves. This will allow the user to increase or change 2D inflow control easier and more standardized.
Guest about 6 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Loading bars for large 2d TIN results.

Vissible loading progress for loading large or TIN modelling results.
Guest about 6 years ago in InfoWorks ICM / Productivity / Terrain 0 Gathering support

colour labels based on flags

Make it possible to colour the labels based on the flags associated with the displayed field values.
Richard de Koning about 6 years ago in InfoWorks ICM / Labels / Visualization 0 Gathering support