Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest about 6 years ago in InfoWorks WS Pro 0 Gathering support

I want combine Critical Link Analysis with multiple scenarios

Today I can only select 1 scenario when running a critical link analysis run (or maybe general multi runs). I want to be able tot select multiple. This way, if I have 5 scenarios, I do not have to create 5 separate runs to check criticality of all...
Caroline Heylen over 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

InfoAsset Planner - Validate Existence of CCTV Video Files

I would like to be able to validate the existence of CCTV survey videos linked to CCTV Surveys. I have found a CCTV survey that has an invalid "Media_Label". In this case I believe the .mpg file was renamed after the survey was submitted since th...
Bradley Nissley about 6 years ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Planner - Allow "Batch Run" in Data Miner

Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run). At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically ...
Bradley Nissley about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Field construction year reference for simulation run.

The field construction year of each object type from WS Pro are not linked to the simulation runtime, so you can get information for future infrastructures that you need to move away from your model or transfer to a new model or scenario. It wo...
Guest over 2 years ago in InfoWorks WS Pro / Engine 1 Gathering support

View model results in InfoAsset Manager

As a user I would like to be able to see hydraulic model results in InfoAsset Manager
Guest over 6 years ago in Other Product Ideas / Asset Management 2 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

The ability to create multiple Selection Lists at once

I am currently working on a model with a large number of DMAs. This means I have to select each specific area, and save this as a selection list - so I can easily identify areas in the future. This is a very time consuming task, and the ability to...
Sam Bonnington almost 3 years ago in InfoWorks WS Pro / Automation 1 Gathering support

To be able to graph refill/depletion rate and/or survival time on reservoirs and towers

in WS Pro
Guest over 5 years ago in InfoWorks WS Pro 1 Gathering support

WS Pro to allow for maxconc at node/hydrant

No description provided
Guest over 5 years ago in InfoWorks WS Pro / Water Quality 1 Gathering support