Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Overhaul to the Hyperlinks system to allow attached data to be transportable

ICM and Infoasset databases offer a system that allow hyperlinked documents to be connected to the database. Primarily this to allow survey, as laid and other background data to be available to the user and is a powerful function that if used corr...
Guest about 4 years ago in InfoWorks ICM / Sharing / Transportables 2 Gathering support

Transportabele database (.icmt) containing an earlier version of the commited network without losing the commit history

For the moment we can only 'branch' an earlier version from the commit history interface or 'copy' this earlier version. - the branch can't be disconnected from the 'mother' network - the copy looses the commit history It would be nice to deliver ...
Pieter Snoeck over 4 years ago in InfoWorks ICM / Data Exchange / Export Data / Transportables 0 Gathering support

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap