Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Add the 'count of assets' under the Linear risk method (same as 5x5 matrix)

The 5x5 matrix provides a great summary on where pipes fall under the different 'buckets' this would be extremely useful for linear risk method as well as it helps the user determine their ranges dynamically.
Martha Nunez over 1 year ago in Info360 Asset / Risk 1 Under consideration

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap

Generate Risk/Rehab results for segments not assets - Stormwater

In stormwater systems assets change structural characteristics along the length of the asset. This means, materials change and this needs to be represented in the risk analysis. In addition, work tasks are generated for segments instead of the ful...
Martha Nunez about 2 years ago in Info360 Asset / Risk 0 Gathering support