Productivity

Showing 7

Save phase results seperately

When working with multiple phases I would like to be able to run one phase (exclude all others from analysis) and have the results saved. Results should only be overwritten when a new run on the same phase is completed.
Andrew Komarnycky about 1 month ago in InfoDrainage / Productivity 0 For Review

Allow changing displayed simple junction size

In plan view we are able to change the sizes of icons, labels, proper manholes and many other parts of our pipe networks, but the symbology for simple junctions is fixed in size (at about 1.2m?) and cannot be changed, which makes modelling, for ex...
Guest about 1 month ago in InfoDrainage / Productivity 0 For Review

Set gradient and/or pipe size of multiple parts within a single flow path in one operation.

In some instances we need to change the gradient or pipe size of an entire flow path. It would be helpful if this could be done in one operation rather than each part individually. Any branch connections could also update to align unless locked.
Guest 5 months ago in InfoDrainage / Productivity 1 For Review

show upstream and downstream cover depth for connections

MicroDrainage used to show this its useful for checking cover to pipes are correct
Matt Hare 4 months ago in InfoDrainage / Productivity 0 For Review

Show manhole types in manhole schedule export

Manhole schedules need to feature cover types (D400, C250 etc), manhole types (Type A, B, C in Scotland etc) and whether they're a backdrop or a headwall etc. Having a feature to assign this based on location on site (cover type), depth to soffit ...
Guest 8 months ago in InfoDrainage / Productivity 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest 5 months ago in InfoDrainage / Productivity 0 For Review

Basin / Swale inlets pick up IL at point of entry, not the bed level

Inlets automatically pick up down stream bed level of SWC. Inlet pipes have to be locked, with the IL's calculated manually which can be difficult to get right along a basin or swale that is long and winding. Would it be possible for the IL pipe t...
Guest 8 months ago in InfoDrainage / Productivity 0 For Review