Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 18 of 1370

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts about 2 months ago in InfoWorks WS Pro / Operations 0 For Review

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez over 2 years ago in Info360 Asset / Query types / Capabilities 1 Gathering support

Provide Preconfigured Rehab Decision Tree Logic for Customers to Get Started

No description provided
Mike Maylone almost 3 years ago in Info360 Asset / Decision Tree Canvas 3 On roadmap

Rehab Action Filter Options for Results need expanded

When querying a Rehab Action in the Results table, we only have the Operator option of 'is any of'. Looking to have the opposite available, something like 'is not equal too'. We are having to select many values to set the filter = where if we have...
Todd Plank 9 months ago in Info360 Asset / Query types / Capabilities 2 Under consideration

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini 10 months ago in InfoWorks WS Pro / Operations 1 Gathering support

Baseline Replacement Cost Tool

IAP has a very simple baseline replacement cost tool. It has been requested to be in Info360 Asset. Could be rolled into the deterioration modeling tool. https://help.innovyze.com/space/infoassetplanner/15794424/Baseline+Replacement+Cost
Tim Medearis about 2 years ago in Info360 Asset / Rehabilitation Planning 1 Gathering support

Manhole Rehab

Many utilities analyse manholes as part of their CIP programs.
Martha Nunez over 1 year ago in Info360 Asset / Decision Tree Canvas 1 In progress

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 7 months ago in InfoWorks WS Pro / Operations 0 For Review

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Operations 0 Gathering support