Skip to Main Content
Autodesk

Get the elapsed time of the simulation in ICM Exchange

It is not possible to get the information of the Job Control window with the current ICM Exchange, but it would be very useful to be able to create a dashboard using ICM Exchange to manage simulations and coordinators.
  • Attach files
      Drop here to upload