Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoDrainage

InfoDrainage - Time of entry to be called time of entry, not time of concentration

Te has specific meaning in the UK when using the rational method (modified). Tc also has speific meaning (Te + sumTf). It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of conc...
Guest almost 4 years ago in InfoDrainage 0 Gathering support

InfoDrainage - replace stormwater outline with DXF (or other similar file)

Would be useful to be able to 'replace outline' of a stormwater control by importing a polygon (e.g. DXF, SHP etc), rather than the existing options which are just to redraw in ID only. Every project there seems to be need to replace an outline fr...
Guest almost 4 years ago in InfoDrainage 1 Already exists

Improved tutorial for setting up a network

InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullie...
Guest almost 4 years ago in InfoDrainage 1 Under consideration

Enhance InfoDrainage Long Sections

No description provided
Guest almost 4 years ago in InfoDrainage 1 In progress

Sewer Design - Locking gradients

It would be useful if you could lock sewer gradients or manhole relationships so that if you changed an upstream level it would automatically amend downstream levels
Guest almost 4 years ago in InfoDrainage 1 Gathering support

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss about 2 years ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 2 years ago in InfoDrainage / Auditing / Reviewing 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest about 2 years ago in InfoDrainage / Hydraulics 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 2 years ago in InfoDrainage / Productivity 0 For Review

Add Simple Index Approach tool to InfoDrainage

It would be good if we we can get the "Simple Index Approach" tool inside InfoDrainage.
Dilraj KT about 3 years ago in InfoDrainage / Other 1 Gathering support