Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 275 of 1370

Automated data synchronisation

We need to have the ability to do automated data synchronisation so our users don't have to do the manual import all the time for data updates.
Michelle Mcmillan 3 months ago in Info360 Asset / Asset / Spatial Data Import 0 For Review

Improved Scenario Manager

Improved options around the parent child options. basically setting up a more structured option so that if you update a parent scenario (not just the base) then all child scenarios (ideally copied from during creation) would get the updates. i.e. ...
Duncan Allen almost 2 years ago in InfoWorks WS Pro / Productivity 6 In progress

Scenarios should stop tracking differences when values return to default

Our organisation is using scenarios to manage alternate model configurations like Peak Day, Average Day, etc. in our main working model. Over time some field values will change from the Base value, and then change back (or the other way around, wh...
Dave Watts 3 months ago in InfoWorks WS Pro / Other 1 Under consideration

Improved scenario organization

Can we have the scenarios functionality improved to allow for scenarios to be organized into folders, ordered by various attributes (other than time of creation) and a search function within the scenario window. It would be useful to have the fold...
Guest about 2 years ago in InfoWorks WS Pro / Engine 3 In progress

Additional Custom Fields available when needed

Our company uses all available user fields and needs additional room for sharing important metrics derived from hydraulic analyses. We want an option to toggle on additional fields to store this information alongside pipes for Themes and references.
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Other 1 Under consideration

Dark theme for InfoWorks

I prefer working from a dark theme to reduce eye strain while working in models multiple hours day.
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Other 0 Gathering support

Comparing the inputs of two runs

When I have two runs, I can compare the results of both of them. But for some cased I would need to compare the parameters or simulation options. This would be similar to comparing two versions of network database but its focusing globally on the ...
Guest about 1 month ago in InfoWorks WS Pro / Productivity 2 Gathering support

Moving multiple nodes and links simultaneously

The “Move Nodes” option under GeoPlan > Geo Plan tools does not seem to allow for the moving of multiple nodes simultaneously. Additionally, having an option to move selected objects in one go would be very helpful, allowing a user to move grou...
Guest 8 months ago in InfoWorks WS Pro / Productivity 1 Gathering support

Attach reports (pdfs) to asset

We sometimes get inspection data in a pdf format and other times we may have a write up on the condition of the asset. It would be useful to attach this to the asset.
Lauren de Bude 5 months ago in Info360 Asset / Import / Upload 1 Gathering support

Upstream and Downstream Trace Icons are misleading

Minor annoyance here and possible solution- can you change the icons for the upstream and downstream trace to actually be meaningful? at the moment both icons represent downstream and upstream trace at the same time and it doesn't make sense
Daniel Alexander 5 months ago in InfoWorks WS Pro / Other 1 Gathering support