As a user it is good to allow tab windows to take it out to the second or third display

Tab windows are not allowed to move main window to second display.
Guest about 5 years ago in InfoWorks WS Pro 0 Will not implement

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega almost 3 years ago in InfoWorks WS Pro / Operations 2 Will not implement

Site 3d default manholes

Can the default manholes be the most recent design and notation please? It currently defaults to SfA 6, need to be SfA7 currently or even have a user editable toggle to decide what version is being used. At the moment I have to edit every manhole ...
Guest over 3 years ago in InfoDrainage 0 Will not implement

Missing design function and short cut

1. Add vehicle tracking function to software. 2. Be able to save to dwg format individual roads ( plan, long section and cross section) all layers with one click rather than saving the whole development plan if only revising one road.
Guest over 3 years ago in InfoDrainage 0 Will not implement

Add update to existing network for the 'Export to Civil3D’ in DrawNetCAD

It would be very useful if DrawNetCAD had the option of updating an existing Civil3D pipe network when using the Export to Civil3D option. The Autodesk Microdrainage Utility has this ability, albeit it can be unreliable.
Guest over 3 years ago in InfoDrainage 0 Will not implement

I have been testing your export features using a number of simulation results with a selection set. This does not work as it is supposed to

Results export to CSV does not work with selection sets, it always just exports all of the network
Guest over 5 years ago in InfoWorks WS Pro 0 Will not implement

allow multiple selection lists in a shutdown simulation

I am currently working on a long-term planning of our pipeline renovation projects. I need to determine which projects can be executed simultaneously. My approach at this time is to create a selection list of all the pipes that would be taken out ...
Guest almost 6 years ago in InfoWorks WS Pro 0 Will not implement