Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 231 of 1372

XPSWMM with TUFLOW 2023 Latest Release

XPSWMM 2024.2 is using an OUT OF DATE TUFLOW engine that will not finish 2D simulations! UPDATE THE ENGINE
Guest over 1 year ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 For Review

InfoAsset Online - "Sort by the date" option in selection grid

If there is a way to put the surveys which are part of a Work Package search into date order, It would be beneficial to our users. Some of our jobs involve several visits and it would be better for the user to be able to see the latest surveys at ...
Guest over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review

Specify number of demands

I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
Colin Ricks almost 6 years ago in InfoWater Pro / Other 3 Under consideration

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest about 6 years ago in Other Product Ideas / Asset Management 1 For Review

Allow Customized Reports to Also Include Standard and Fireflow Results - Just Have One Result Table

Currently all model element information and results are separated between the DB Editor, Customizable Report, and Output Report/Graph. This is confusing and hard to export specific information together without having to combine it later in Excel o...
Joe Lawrence over 4 years ago in InfoWater Pro 1 Gathering support

Include an "excluded search nodes" warning in fireflow output table

When the design pressure exceeds the static pressure at a particular node, that node will be excluded from a design fireflow model run. The output table should include a banner at the top listing the excluded nodes, as these can make a big differe...
Guest over 4 years ago in InfoWater Pro / Engine 0 In progress

inlet riser option for tank

Have an option to specify an Inlet Riser Pipe for the tank element. This would hold the fill head at a constant, set at the riser pipe elevation, but allow the tank discharge head vary with the tank level.
Guest almost 5 years ago in InfoWater Pro / Engine 0 Gathering support