Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 225 of 1370

As a user, I would like the computing time to be reported as clock time rather than CPU time in XPSWMM 2D

I just noticed this when trying to run a test on model speed. This is with the “CPU” Extreme option and 4 CPUs selected. The clock time is about 16 minutes, but the elapsed time is showing at 58 (close to 16x4). I think the ET is counting CPU time...
Guest about 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

CAM Enhancement

CAM Enhancements A few things to consider that I think would make your tool better than others I have seen/used: 1. The ability to export the pounded areas into GIS. It seems to me this shouldn’t be difficult as you are color coding them now in ...
Guest about 5 years ago in InfoWater Pro / Engine 0 Under consideration

Customize pipe ID field in UDF field journal

Currently the model ID's are populated in the "Pipes to Flush" box of the UDF field journal. We store our GIS Asset ID in an information field. We want to use this field as the basis of communication with field teams.
Guest about 5 years ago in InfoWater Pro / Operational Modeling 0 Gathering support

As an organisation we want InfoAsset Manager to be able to show dimensions relative to fixed points

In plans underground assets are often positioned using dimensions relative to a fixed point (pe corner of a house). InfoAsset Manager should be able to create dimensions like that.
Bram Calle about 5 years ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Planner - View Multiple CCTV Videos Concurrently in Facility Assessment Tool

I have had a request from the Asset Condition and Reliability team to be able to view CCTV survey videos side-by-side when a pipe has multiple CCTV surveys. In the same way that the longsection view shows concurrent surveys, being able to see conc...
Bradley Nissley over 5 years ago in Other Product Ideas / Asset Management 0 For Review

InfoSWMM from InfoSewer should allow the user to pick a scenario on import. It is a feature of InfoSWMM to convert an InfoSewer MXD and IE

We only allow the user to import the active scenario in InfoSewer. If a user does not have InfoSewer then he or she must guess which is the active scenario. It would better to have a dialog to allow the user to import their selected and needed sce...
Guest over 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

InfoWater SA to be capable of managing transparency in the background layers

Not having the capability in InfoWater SA to manage background information as used to be possible with H2OMap affect directly the efficiency of the product itself. Clarence Valley Council
Guest over 5 years ago in InfoWater Pro 0 Will not implement

Smarter UDF Flush Sequence Manager Operations tab selection tools

When using the UDF Flush Sequence Manager Operations tab [Close >], [Open >], or [Remove >] selection tools, I would like to receive the error "WARNING: Node ### is not in the Selection Set 'VALVES'" less often. Currently you must zoom ...
Guest over 5 years ago in InfoWater Pro / Productivity 0 Gathering support

As a user, I would like to be able to print the dynamic long section view in PDF exactly like on the screen in XPSWMM.

No description provided
Guest over 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

Automated exchange with CMMS System

I want to use InfoAsset Planner on a (near) daily basis for optimizing O&M. The API connection to CMMS systems like Lucity and Cityworks is good but it still requires manually importing the data and manually creating work orders to send out. ...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 Gathering support