Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 125 of 1370

INTERLIS format importer of XML data for CCTV and Manhole Survey data

Support the importation of INTERLIS format XML data of CCTV and Manhole Survey data
Krzysztof Tchorzewski 7 months ago in Other Product Ideas / Asset Management 0 For Review

PACP Split Survey observations enhancements

The issue is when the application is asked to split a survey and the survey is a PACP inspection, NASSCO expects a few things to be on the inspection. First, the first code on the inspection should be AMH with remarks (this could be the node that ...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Generate Stats reports as a background task

Generate Stats reports as a background task so User Interface isn't locked - as for simutations and meshing
Robert Woodall almost 4 years ago in InfoWorks ICM / Performance / Results 0 Gathering support

Better Video Encoders

The AVI recorder uses a Windows 11 unknown CODEC - update the video encoder to something modern!
Guest over 1 year ago in InfoWorks ICM / Performance 1 Under consideration

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 5 years ago in InfoWorks ICM / Performance 1 Gathering support

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd about 2 years ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest about 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review

Enable time fields to be used in calculated value

For numeric user defined object fields set to time allow them to be used in the calculated value function in Mobile forms
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review