Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 203 of 1372

Capability to View Manhole Panoramic Scans

Many of our client's manholes were surveyed with panoramic scans, so there are no still images that we can link to within InfoAsset Planner to view the inspection. We would like to ability to view manhole panoramic scans. The file format of these ...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Planner - Allow Renaming of Data Miners

Allow Data Miners to be renamed in Data Miner.
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Planner - Create Sub Groups in Operation Center

Allow Analyses, Toolbox Reports and Data Miners to be sub-grouped in Operation Center Tabs. This would help with keeping track of what goes where and simplify workflow when working on multiple, independent evaluations or evaluations with multiple,...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

As a company we wish to trace live / assets. our Networks include abandoned assets resulting in incorrect traces urrent traces h

option switch to exclude closed / abandoned assets from searches. searches being undertaken in InfoAssetOnline currently identifing incorrect list of u/s or d/s assets viewed.
Richard Robinson almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 2 years ago in InfoWorks ICM / Results 2 Already exists

Update of underlying data model to be included as an option on the welcome screen

The question has been raised regarding the manual upgrade of the underlying data model. The statement that it is up to the user to update the data before commencing analysis but it is a manual task. A suggestion was that perhaps this update could ...
Ann Pugh about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Flags for tracing and long section

Placing flags at any node and having a "connect" button based on network connectivity leads to a big increase in workflow productivity. Flag tracing can be very useful for long section selection, upstream tracing from pump stations, and long secti...
Casey Shannon about 2 years ago in InfoWorks ICM / Results 1 Gathering support

Events API for Demand Forecast Tuning

Use Ticketmaster API to tune Demand Forecast models
Javier Cantu about 2 years ago in Other Product Ideas / Artificial Intelligence 0 For Review

Warning Messages in InfoSewer

Is there a way to stop the program from checking for this? InfoWater has the Engineering Validation Manager which allows the “rules check” to be toggled on and off. The user does not want to see Negative Flow Warning messages in the RPT file of I...
ROBERT DICKENSON over 4 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

As a user, when transmit a model in XPSWMM, I would like the externally referenced surface, soil and landuse also be packaged.

In XPSWMM, when 2D data are referenced externally, they are not packaged when transmit the model
Guest over 4 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support