Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 138 of 1442

Automate concurrent Fireflow simulations

When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possibl...
Guest over 6 years ago in InfoWater Pro / Engine 0 Gathering support

For fire flow simulations, I would like to have range reports for pipes, valves, pumps, reservoirs, and tanks.

For example, I would like to know the maximum, minimum, and average velocity through each PRV across all fire flow runs in a simulation.
Guest over 6 years ago in InfoWater Pro 0 Gathering support

Add multiple rows to the InfoWater "Rule Header" DB table

In the "Pipe Control" or "Node Control" DB tables, I can insert or append multiple rows at once. In the "Rule Header" DB table, I can only insert or append one row at a time, and each row must have an ID. Please make the behavior of this table co...
Colin Ricks over 3 years ago in InfoWater Pro 0 Under consideration

Innovyze License Administrator

New license administrator is terrible compared to the previous one.
Michael Wetterau over 3 years ago in InfoWater Pro 0 Will not implement

Add Live Modeling

Understand and manage water distribution networks better. Add live modeling to incorporate real-time performance data. Model water quality and age. Configure live alerts so operators can quickly see what areas need attention.
Guest over 3 years ago in InfoWater Pro 1 Will not implement

Image Import Information: File Types and Sizes

Would like to see the list of accepted file types (SVG, PNG, JPEG, PDF, etc.) , and file size limitations.
Amelia over 3 years ago in InfoWorks ICM / GIS Layers / Import data 0 Gathering support

ICM - Import of .XP files

Current workflow for importing a XPRAFTS or XPSWMM/XPSTORM model into ICM is to export the XP model to a .XPX file. This is problematic as a user will need to own a XP licence to complete this step and is not always the case. This is particularly ...
Guest almost 4 years ago in InfoWorks ICM / Import data 1 Will not implement

Allow the InfoWater Pro "Live Data Adapter" to use non-live data

The Live Data Adapter can be a powerful tool for calibrating models, but is difficult to set up. Many times, you don't have permission to connect to the SCADA historian database. Right now, it only supports ClearSCADA, PI, SQL Server, and Oracle, ...
Colin Ricks almost 5 years ago in InfoWater Pro 0 Gathering support

Display Warnings when Tank Stage/Volume Curve Inconsistent with Levels

As far as I can tell this is an EPANET bug, but say your tank levels are set to minimum 4 and maximum 20. If you have a stage/volume curve that goes below 4, your tank will supply water forever from a level of 4 feet.
Guest about 5 years ago in InfoWater Pro 1 Already exists

Bring back the pause button for calculation.

In one of the first version of Infoworks there was a pause button for calculation. We have some big calculations who mostly run at nighttime. Sometimes the run is so big it still runs in the morning. The only thing we can do is stop the calculatio...
Erik Amting over 5 years ago in InfoWater Pro 0 Will not implement