Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Reporting

Showing 7

Results tables to be ordered from most upstream junction/connection to outfall

As per the title, currently the results tables are presented in numerical order - which doesn't always make sense when interpreting the results. I.e should be presented in the same order they were in Microdrainage.
Guest over 1 year ago in InfoDrainage / Reporting 0 For Review

Order Junction & Connection Results Printout by Flowpath (to match the Model Printout)

Issue: When using the 'print' feature, if a flow path is selected, the model summary for junctions will show ALL connected pipes, in 'flow' order, which is very useful for presenting/understanding data. However, in the results tab for connections,...
Alex Purcell over 1 year ago in InfoDrainage / Reporting 0 For Review

Video generation of InfoDrainage simulations

Requesting the ability for InfoDrainage to export simulations to .mp4 or .avi files for distribution and review. Right now, you can play the simulation in InfoDrainage, but need a screen capture software to record the results into the video for ex...
Tim Medearis 9 months ago in InfoDrainage / Reporting 1 For Review

Annotation

Please can we request the ability to add free notation e.g. model notes / assumptions. A similar feature was present in MD DrawNet and allowed communication of model specifics within the model.
Matthew Johnson over 1 year ago in InfoDrainage / Reporting 0 For Review

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest over 1 year ago in InfoDrainage / Reporting 2 For Review

ARR critical storm analysis in Comparison Report

Please update the comparison report feature in InfoDrainage to allow ARR design storms - critical storm per drainage element. We currently cannot compare phases when using ARR storms.
matthew.piggott 10 months ago in InfoDrainage / Reporting 0 For Review

Sort Manhole Schedules in Numerical Order

Hello, It should be possible to sort Manhole Schedules in Numerical Order - currently the randomness has lead to many questions & queries from site which has a risk for setting out/construction errors. It should also be possible to add MH type...
Guest over 1 year ago in InfoDrainage / Reporting 0 For Review